Print preview Close

Showing 116 results

Archival description
Print preview View:

2 results with digital objects Show results with digital objects

Jardin Grande - Allée and Jardin St. Cyrille

File consists of 18 drawings, including 7 preliminary drawings, 5 design development drawings, 6 working drawings. Also includes 2 project files (correspondence, specifications, meeting minutes, sketches, 2 photographs)

Nouvel Aéroport International de Montréal

File consists of 138 drawings, including 85 preliminary drawings, 9 design development drawings, 44 working drawings. File also includes 55 project files (including one with landscape drawing details and 17 photographs).

Pont du Portage

File consists of 45 working drawings, a 21-page manuscript (ink on vellum, sepia, prints), 4 negatives, and 1 photograph. Also includes 10 project files for 7101 (specifications, details and contract documents, correspondence, site meetings, notes).

Quebec Cartier Mining Company New Town

File consists of 46 drawings, including 14 preliminary drawings, 3 exterior perspective sketches, 3 exterior renderings, 26 design development drawings. Also includes 3 project files (correspondence, costing, scheduling, specifications).

Cutler House

File consists of 4 drawings, including 2 schematic drawings and 2 drawings of existing site conditions

Termination of Robert Avenue

File consists of 5 drawings (2 concept sketches, 2 existing working drawings from the office of Guy Desbarats, Architect, 1 proposed site development). 1 is pencil and ink on vellum, 2 are marked-up prints, and 2 are marker and ink on trace (no project file).

Results 81 to 90 of 116