General note
The landscape consisted of site improvements to Plant #1, Plant #2, Plant #5 and the R&D Engineering Building. "Landscape treatment concentrated on improving surface drainage and reducing snowdrifts within the circulation and parking areas in an unprotected location. Evergreen planting act as an efficient snow control measure." (source: John Schreiber, drawing P-2)