File consists of 8 drawings, including 2 equipment location plans for water treatment, 2 exterior perspectives, 3 preliminary drawings, 1 working drawing, and 1 project file (specifications, correspondence).
File consists of 8 drawings, including 6 preliminary drawings, 1 design development drawing, 1 working drawing , and 1 project file (correspondence, specifications).
Includes 6 drawings: 3 preliminary drawings, 3 design development drawings (4 ink on sepia, 1 ink on linen, 1 ink on vellum). Also includes 1 project file (correspondence, specifications).
File consists of 28 drawings including 12 working drawings, 12 preliminary drawings, 3 drawings from the office of Moshe Safdie and Associates, 1 existing site condition. Also includes 1 project file (correspondence).
File consists of 11 drawings, including 2 preliminary drawings, 1 design development drawing, 7 working drawings, 1 shop drawing 8 pencil on vellum, 2 pencil on trace, 1 print, and 1 project file (correspondence).