- CA RBD MSG 1080-1-5
- Part
- 1939-1942
Contains views of construction of the building interiors including shot blast pit, pouring concrete floors, roofs, steelwork, tank pit, etc.
2032 results with digital objects Show results with digital objects
Contains views of construction of the building interiors including shot blast pit, pouring concrete floors, roofs, steelwork, tank pit, etc.
FWP C 101. Fort William Works. Building No. 7. New South Wall. C-101
FWP C 95. Ford William Works. Building No. 8. Concrete floor at East end of aisle B. C-95
FWP C 96. Ford William Works. Building No. 8. View of roof, looking West. C-96
FWP C 99. Ford William Works. Building No. 6. South side. Forms for shot blast pit. C-99
FWP C 92. Fort William Works. Building No. 5, first floor. (Tabulating Dept.) C-92
FWP C 91. Fort William Works. Building No. 5. C-91
FWP C 86. Fort William Works. Building No. 6. Pouring concrete in centre bay. C-86
FWP C 84. Fort William Works. Store building (Bldg. No. 7) Concrete floor completed