Print preview Close

Showing 12 results

Archival description
Print preview View:

Aménagement du Champ de Mars, Vieux Montreal

20 drawings:5 existing conditions drawings, 10 preliminary drawings, 5 design development drawings4 sepias, 4 ink on vellum, 9 prints, 1 ink on mylar, 1 pencil on trace, 1 pencil on vellum90 x 150cm, 288 x 43cm.1 project file (project brochure)

Le Plateau Marquette

55 drawings:1 existing city plan, 10 preliminary sketches, 13 design development drawings, 31 design development sketches1 print, 5 marker and ink on trace, 5 ink on vellum, 1 marker on mylar, 10 ink and marker on sepia, 33 marker on trace38 x 61c...

Fowler Lines

File consists of 9 drawings, including 1 title page, 2 exterior perspectives, 6 preliminary drawings, and 6 project files (correspondence, contract, report).

Complex Guy Favreau

File consists of 146 drawings, including 98 preliminary drawings, 47 design development drawings, 1 presentation drawing, and 11 slides, as well as 5 project files (correspondence, minutes of meetings)

John Schreiber/Ron Williams Architects, Landscape Architects

Cité Parlementaire Complexe G

File includes 39 drawings, including 5 shop drawings, 9 preliminary drawings, 22 design development drawings, 3 working drawings, and 1 photograph of plan. Also includes 9 project files (correspondence, minutes of meetings, planting information, s...

Results 1 to 10 of 12